![]() You would be amazed at the file size difference from saving the file with the drafting view current compared to a 3D shaded and shadowed view current. If the file is saved with this view current, the file size of the Revit project will be smaller as the preview does not include any graphics.If set as the starting view, it enables Revit to load the view quicker when opening the project. ![]() This drafting view does not include any graphics and serves two purposes. ![]() Many companies will create a Drafting View that includes the project name, and specific criteria about the project and perhaps brief instructions on how the Revit file is to be used, then set the view as the starting view. In the Starting View dialog box, pick the drop-down list and select the desired view in the model to be opened by default each time you open the project. For example a Realistically shaded view with shadows turned on will take longer to open than a drafting view with some text. Depending upon the view this may cause Revit to take some time opening the file. So whatever view was last opened when the file is saved is the first view that is opened. The default view to be opened is the Last Viewed. Once this tool is selected the Starting View dialog box is displayed. After looking at each tool icon I found the tool under the Manage tab>Manage Project panel>Starting View Tool. I knew it had to be in the Manage tab somewhere. I remembered that beginning in Revit 2012 this was possible but for the life of me I could not find it in Revit 2013. ![]() The other day I was creating some training datasets and I wanted to be able to open the dataset to a predefined view.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |